Cooling tower packing price at using 4 years or be replaced on a regular basis, to ensure the normal working efficiency of the
cooling tower, have long existed aging, part of the packing is off, resulting in a decline in the heat capacity of the cooling tower.
Affect the efficiency of the refrigerating units, large quantities of energy.
At the same time, the broken cooling tower packing with the operation of the cooling water pump into the units within the condenser copper pipe, combined with our current use of a new type of cooling water treatment agent (
Hydroxy carboxylate)
Has a strong function of stripping rust causes of condenser copper pipe blocking phenomenon.
< br /> cooling tower filler in implementation of replacement method, roughly the time required for < br /> 1, the water spray packing should be assembled according to the design, installation requirement.
General component is molding pieces of the design length of 1.
0, 1.
25, 1.
5, 2.
0 m four specifications, for different engineering design to choose.
Considering the easy installation and inspection of each unit assembly block volume shoulds not be more than 0.
5M3。
< br /> 2, water spray packing using binding type assembly, should be conducted on flat ground, on-site environmental temperature shall not be lower than 5 ℃.
After a group must immediately with flat steel plate pressure, prevent buckling of degumming, because of molding pieces of itself behind the adhesive dry consolidation can be moved in a flat on the ground, stacking height should not be more than 2 m.
To prevent long-term exposure.
< br /> 3, should according to the tower layout situation, in a planned way cutting small packing filling irregular air gap.
Assembly should be squeezed between filling.
, shaft and column beam between packing and column wall should also fill clamping, great gap should not exceed 20 mm.
< br /> 4, when installation should pay attention to assembly direction from top to bottom, each layer of top surface to be laying flat, interlayer to clean up, can not have sundry jam.
< br /> 5, installation, maintenance and other work need to work on the packing, must undertake the tablet on the shop, it is strictly prohibited to trample directly.
< br /> 6, in the process of construction, assembly, installation, welding work of above the packing shall be strictly forbidden, fire prevention measures should be taken when necessary.
< br /> 7, when installation should hold people accountable for, strict organization and check, ensure the installation quality.
< br /> < br /> < br>
Jiangsu Huatal Cooling Technology Co., Ltd. have now decided to extend our company in other countries.
If cooling tower manufacturer isn't meeting your needs, or you just want to see what else is out there, check out these content monitoring alternatives Huatal Cooling Tower.
If you need any help in cooling tower manufacturer water cooling tower, Jiangsu Huatal Cooling Technology Co., Ltd. can help you. We provide the best in class. Our design and services will enable you to create the ideal room that you have always wanted!